- Model NO.: YK3000L-3
- Raw Material: HDPE
- Automation: Automatic
- Certification: CE, ISO9001:2008, QS
- Transport Package: Wooden Packing or Nude
- Origin: Qingdao
- Type: Extrusion Blow Molding Machine
- Making Method of Parison: Extrusion-Blow Molding
- Computerized: Computerized
- Trademark: YANKANG
- Specification: CE
- HS Code: 8477301000
1.Adopt Siemens PLC,Siemens Touch Screen and MOOG to make the operation easy.Â
2.Adopt progressive hydraulic system by ourselves,easy to control.
3.Adopt inverter to control the clamping system,saving a lot of energy.
4.The technology of DIe Head is the same with Germany.
5.Configuration:
PARISION CONTROL THINCKNESS CONTROL | MOOG | JAPAN |
PLC | SEIMENS | GERMANY |
TEMPERATURE CONTROL MODULE | SEIMENS | GERMANY |
SERVO VALVE & SERVO TRANSDUCER | MIRAN | ITALY |
INVERTER | SEIMENS | GERMANY |
HYDRAULIC OIL SEAL | DZ | TAIWAN |
INTERMEDIATE RELAY | OMRON | JAPAN |
PNEUMATIC VALVE | AIRTECH | TAIWAN |
HYDRAULIC PUMP & VALVE | YUKEN | JAPAN |
PNEUMATIC SWITCH & CONTACTOR | SEIMENS | GERMANY |
HYDRAULIC MOTOR & SCREW MOTOR | SEIMENS | GERMANY |
REDUCER | GUOMAO | CHINA |
6.Specification
No |
 |
specifications | 3000 Liter |
 |
 |
Model No. | 3Â layers |
 |
 |
Processing material | HDPE/HMWHDPE |
1 | Extruders | Gear Box Type | Hard Surface |
Extruder Drive Motor(Inter) | 75KW | ||
Extruder Drive Motor(Middle) | 75KW | ||
Extruder Drive Motor(Outer) | 75KW | ||
Heating Load | 110KW | ||
Max Screw Speed | 60RPM | ||
2 | Accumulator Die Head |
Pusher Cylinder | ∮560X400mm |
Heating Load | 90KW | ||
Parison Control Cylinder | ∮530X50mm | ||
Die-Core size[Min/Max] | ∮300-700mm | ||
Max. Parison weight | 80KG | ||
3 | Moulding Clamping Unit |
Clamping Platen Size | 2100X2200mm |
Max Mold Size | 1900X2300mm | ||
Mould Clamping Force | 2200KN | ||
Mould Thickness | 1000-2200 | ||
Clamping Pull Bar | 150mm | ||
4 | Hydraulic System | Hydraulic Drive motor(Main) | 45KW |
Hydraulic Drive motor(Parison Control) | 7.5KW | ||
Oil Tank Capacity | 1200L | ||
5 | Gripper | Gripped Stroke | 350mm |
Discharge Stroke | 2400mm | ||
6 | Hopper Loader | Loader | 800kg/H 3pcs |
Hopper | 50Kg 3pcs | ||
7 | Weight |
 |
65Ton |
8 | Size |
 |
12X4.5X7.2M |
9 | Total Power |
 |
350KW |
10 | Average power |
 |
250KW |
Â
Â
DELIVERY TIMEÂ Â
5 months after the down payment;
TRAINNING
The Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;Â
INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week(free of charge) in the Buyer's factory. After one week,if the Buyer still needs the training,$100 should be paid for the engineer.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's food & board while installation in buyer's factory.And the Buyer should also pay for the air ticket for the engineer.
GUARANTEEÂ
The guarantee time is one year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won't be listed in guarantee coverage.
Commodity | Output | Unit | Weight | Unit |
1000 L Mould | 12 | PC/H | 18 | KG |
1500 L Mould | 9 | PC/H | 26 | KG |
2000 L Mould | 8 | PC/H | 36 | KG |
2500 L Mould | 7 | PC/H | 45 | KG |
3000 L Mould | 6 | PC/H | 54 | KG |
DELIVERY TIMEÂ Â
5 months after the down payment;
TRAINNING
The Buyer could dispatch their operators to the Seller's factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller's technician could train the Buyer's operators in the Buyer's factory in the periods of installing & adjusting;Â
INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week(free of charge) in the Buyer's factory. After one week,if the Buyer still needs the training,$100 should be paid for the engineer.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer's food & board while installation in buyer's factory.And the Buyer should also pay for the air ticket for the engineer.
GUARANTEEÂ
The guarantee time is one year after the machines normally works in the Buyer's factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won't be listed in guarantee coverage.
Semi-Metallic Motorcycle Brake Pads
Disc Brake Pads,Performance Brake Pads,Semi Metallic Brake Pads,Semi-Metallic Motorcycle Brake Pads
Wenzhou Tuxing Automobile and Motorcycle Parts Co., Ltd. , https://www.txmotorparts.com