Electromagnetic flowmeter installation precautions in pollution control

Electromagnetic flowmeter sewage treatment process is mainly through the biological oxidation, flocculation, precipitation and other processes to achieve the purpose of sewage purification, in each stage requires a certain amount of meter to measure. In the sewage industry, electromagnetic flowmeters are as small as DN15 and as large as DN2000 calibers.

Electromagnetic Flowmeters Large-diameter flowmeter sensors in wastewater plants are mostly installed underground, so it is recommended to choose IP68 (dust-proof submersible). Usually electromagnetic flowmeters require all the following requirements for the installation site.

1) When measuring the mixed phase fluid, select the place that will not cause phase separation; when measuring the two-component liquid, avoid installing in the downstream where the mixing is not uniform; when measuring the chemical reaction pipeline, install it in the downstream of the reaction fully completed segment; Meet the straight pipe before and after the paragraph is not less than 5D and 2D;

2) Avoid as much as possible negative pressure in the measuring tube;

3) Choose a place with little vibration, especially for integrated type instruments;

4) Avoid large electric motors, large transformers, etc. nearby to avoid electromagnetic interference;

5) It is easy to realize the place where the sensor is grounded separately;

6) Avoid high concentrations of corrosive gases in the surrounding environment as much as possible;

7) Avoid direct sunlight as much as possible