Model NO.: GQ-B01
Certification: ISO, CE, RoHS
Warranty: 12 Months
Customized: Customized
Condition: New
Trademark: GQ
Transport Package: Wood Case
Specification: 1.5L
Origin: Dongguan
HDPE barrel blow mould / Plastic container 1L 2L 4L 5L 10L 20L 25L 30L 60L 120L blow mold, plastic blow mouldMould steel |
NAK80,718H,P20,1.1730,2344,SKD61,2316,S136,3Cr13 etc. |
Plastic material |
PP,PS,PE,PET,TPR,PVC,PA,POM,ABS,PC,PPR etc. |
Mould base |
LKM,HASCO etc. |
Hot runner system |
HASCO,YUDO,D-M-E etc. |
Standard mould parts |
DME,HASCO,JIS,CUMSA etc |
Design software |
UG,PRO-E,AUTOCAD,MOULDFLOW,SOLIDWORKS etc |
Min mould life |
different steel different production, min mold life 200,000 shots |
Doff way |
Auto by ejectors, Doff plates, Air valves etc. |
Leading time |
1week-2 months |
process |
CNC, High speed carve, E.D.M, Wire cut, Drill, Injection etc. |
Packing |
Free fumigation case |
 Q&A on the plastic injection mold
Â
Q. I have an idea for a new product, but don't know if it can be manufactured. Can you help?
A. Yes! We are always happy to work with potential customers to evaluate the technical feasibility of your idea or design and we can advise on materials, tooling and likely set-up costs.
Q. What are the advantages to having my parts manufactured locally?
A. Vertex can offer quick reaction times to any changes in specification, batch size or material. We can ship small or large quantities anywhere in Europe overnight to accommodate unforeseen changes in demand.
Q. My components have already been developed on CAD. Can you use the drawings?
A. Yes! DWG, DXF, IGES, Solidworks and Rhino files can all be used to generate quotes, models and mould tools - this can save time and money in producing your parts.
Q. Can I test my idea/component before committing to mould tool manufacture?
A. Yes, we can use CAD drawings to make models for design and functional evaluations.
Q. What type of plastic is best for my design/component?
A. Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.
Â
Q. What type of mould tool do I need?
A. Mould tools can be either single cavity (one part at a time) or multi-cavity (2,4, 8 or 16 parts at a time). Single cavity tools are generally used for small quantities, up to 10,000 parts per year whereas multi-cavity tools are for larger quantities. We can look at your projected annual requirements and recommend which would be best for you.
Â
Q.Ok, I've decided to go ahead with my project. How long will it take to get my parts?
A. It can take 3or6 weeks to have the mould tool manufactured depending on the part's complexity and the number of impressions (single or multi). After we have received final approval by you of the new tool, you can expect delivery of parts within 3-5 days.
Â
Enclosure
WYBOX WE Series BOX,WYBOX WE Series Enclosure,WYBOX WE Series Enclosure BOX
wybox inc. , https://www.wybox.com