Jiangsu Haitong welcomes three major production nodes in one day

On September 12, 2013, Jiangsu Haitong welcomed three production nodes, HT011 ship launching ceremony, HT016/017 two ship launching ceremony, and HT012 ship shop keel ceremony.
At 8:28 am, the first 15,000-ton bulk carrier (HT011) built by Jiangsu Haitong for Hengli Group was held at the Haitong Dockyard in Jiangsu. The ship entered CCS classification society, local government leaders, shipowners, classification societies. The design institute and senior leaders of Haitong attended the ceremony.
At 10:58 am, the fourth and fifth 15,000-ton bulk carriers (HT016/017) built by Jiangsu Haitong for Hengli Group were held in the construction section of Jiangsu Haitong.
At 18:28 pm, Jiangsu Haitong also held a keel ceremony for the second 15,000-ton bulk carrier (HT012) built by Hengli Group in Haitong Shipyard, Jiangsu.
In the production organization of the above ships, Jiangsu Haitong overcomes the influence of multiple factors such as high temperature and rain, fine production planning and preparation, mobilizes and organizes effective construction forces, strengthens on-site production organization coordination, and takes effective measures around major construction contradictions at different stages. The organization resolves to ensure that the various nodes are completed as planned.
On the day of the activity, the principle of “safety first” was adhered to. The whole process was “tight and orderly, busy and not chaotic”. The successful development of four projects with three nodes reflects that Jiangsu Haitong's production and management capabilities have reached a new level.

Jump Starter

Jump Starter,Portable Power Bank,Jump Start Battery,Power Bank

Shenzhen High Railway Technology Co., Ltd , https://www.hrw-tech.com

Posted on