Shandong Heze to use buried type new sewage pump

Shandong Heze to use buried type new sewage pump Xiaohe River sewage interception pumping station in Heze City, Shandong Province is displayed in front of the public in a garden-like landscape. A water body regulating valve and a cylindrical lifting rod for hoisting a pump valve are installed. These facilities occupy less than 4 square meters and underground. Deeply buried in the new type of sewage pumping station with intelligent movable prefabricated structures.

At the end of December 2012, Heze City requested that the water network reconstruction and construction of underground sewage pipelines in urban areas be completed before the Spring Festival in 2013. In the early stage, the Municipal Water Conservancy Bureau will build two new two-day collection and discharge of 28,000 tons and 40,000 tons of municipal sewage. Sewage interception and upgrading of pumping stations to concentrate the sewage from more than 30 scattered outlets in urban areas to 3 sewage treatment plants for centralized treatment.

Heze City Water Conservancy Bureau comprehensively considered factors such as environmental protection and energy conservation, saving investment, and finally chose the ground-buried sewage and sewage integrated prefabricated pump station developed by the Asia Pacific Pump & Valve Company.

According to reports, this new type of sewage pumping station is a buried, intelligent, mobile sewage collection, transmission, and drainage integrated prefabricated pump station, from the high-energy fiberglass prefabricated barrel, submersible sewage pump, intelligent automatic control system , underwater automatic installation of coupling devices and other components. This kind of buried prefabricated pumping station is equipped with various equipment components integrated into this movable prefabricated cylinder. The prefabricated cylinder is vertically embedded in the depth of 8 to 10 meters and is fully automated. The power of the pump station is determined according to the size of the sewage and the user's needs. The maximum power of the equipment can reach 135 kilowatts, and the maximum sewage flow rate is 5000 cubic meters per hour. Due to the high degree of integration of the pump station, the civil engineering of the pump body is 1/10 of the traditional concrete structure, and the total cost is only 1/3 of the traditional concrete structure.

The buried prefabricated pumping station is not only widely applicable to the collection, transportation and discharge of sewage, but also applicable to the water diversion, interception and water supply and drainage facilities in urban and rural river basins. At present, the integrated pumping station complete sets of equipment have been successfully applied for national invention patents and new utility patents. The relevant departments require further improvement of technical standards and manufacturing techniques.