On May 16th, the first domestic continuous distillation plant with an annual output of 15,000 tons of DD mixture was built and started to drive at Yueyang Baling Petrochemical Chemical Fiber Co., Ltd., one of Baling Petrochemical's restructuring companies. It is reported that this "short, flat, fast" built DD mixture separation and purification device is currently the largest in the country, the most advanced equipment and technology. The first products produced by the device, dichloropropane, dichloropropene and mixtures of high boiling point and low boiling point, are qualified for four main products: paints, thinners, benzene-free bananas, inks, adhesives and dyes, and soil fumigation. In terms of agents and nematicides, there have been many orders from customers and the market prospects are promising. The construction of continuous rectification plant of DD mixture is one of the construction projects of Baling Petrochemical's focus on supporting reformed enterprises. The chemical fiber company put forward the construction and driving goals of “low investment, short construction period, quick results, and high returnsâ€. Since May of last year, they have formed a highly efficient and capable project team, designed and built, and made full use of spare buildings, safe and reliable waste pipe and idle equipment construction facilities, and completed the installation in only half a year. Among them, two 180-cubic-meter spherical tanks make use of idle compressed air tanks. The filling of the three reaction towers is filled by 10 operators themselves, saving the relevant expenses.
Screw Nut,Bolts And Nuts,Screws And Bolts,Round Head Bolt
CHANGZHOU LVSONG INTERNATIONAL TRADING CO.LTD , https://www.yuanhangsupply.com