The Effect of Excessive Crankcase Mud on the Engine of High-altitude Work Truck

During the operation of the high-altitude vehicle engine, high-pressure unburned gases, acid, moisture, sulfur and nitrogen oxides in the combustion chamber enter the crankcase through the gap between the piston ring and the cylinder wall, causing wear of the components and the wear thereof. Metal powder is mixed together to form sludge.

A small amount of sludge can be suspended in the oil and when it equates to a large amount, it will precipitate out of the oil, clogging the filter and the oil hole, causing the engine to be difficult to lubricate, thereby aggravating the wear of the engine. In addition, oxidation of the engine oil at high temperatures generates film and coke. Bonded to the piston, so that the engine oil consumption increases, the power drop, so that the piston ring stuck and pulling cylinder.

The manufacturer of high-altitude trucks reminds: To reduce the production of sludge, it is necessary to use high-quality fuel, so it is recommended that the owners of the aerial vehicles should try their best to refuel at the correct gas station. In addition, the use of quality lubricants and in accordance with the manufacturer's requirements The maintenance cycle is also crucial for the replacement of lubricants and oil filters. In addition, please check your own car's oil level frequently.

Cabinet Hardware

This classification principally includes the aluminum or zinc alloy die casting Machinery Parts using in Cabinet area.
In the die casting process,higher specific pressure is required, so that higher filling speed can be achieved,which is useful for alloy to overcome mold filling resistance.and effectively fill each part of the cavity.The Casting General Tolerance is Grade GB-CT4.
Process Technology: High pressure die casting,Shot Blasting,NC Machining,Spray Coating
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing,Deburring,Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: Cabinet
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Aluminum Die Casting Cabinet Hardware Part,Aluminum Casting Part for Cabinet,Zinc Die Casting Cabinet Hardware Components

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.casting-part.com

Posted on