Model NO.: PA-CM
Voltage Range: 380V
Frequency: 50Hz/60Hz
Evaporator Type: Water Tank/Shell and Tube Stainless Steel Plate
Operating: Automatic
Trademark: Packer
Transport Package: Wooden Case
Specification: 900 * 520 * 850 mm
Origin: China
HS Code: 8504401300
1, Summarize for water chillerWater chiller is adopted in the carbonated drink production system, juice product system and bottle blowing system. According to different capacity requirement, it can be chose.
Different beverage production technology need different chilling water. For carbonated drink production, it need keep water around 4 degree centigrade. In the juice production, it need cold water for cooling hot bottles. In the bottle blowing system, it need cold water to cool bottle blowing mould.
2, Designing for water chiller
3, Features of water chiller
1, according to different requirement, air type water chiller and water cooled chiller can be chose.
2, lower energy consumption and lower noise
3, new machine design offer a higher heating exchanging efficiency
4, lower wasted water discharge
5, easy operation and machine can work automatically
4, Main technical parameter of water chiller
Model | PA-CM-3WD | PA-CM-5WD | PA-CM-8WD | PA-CM-10WD | PA-CM-12WD | |
Cooling capacity | 5.2 kw | 7.8 kw | 13.5 kw | 16 kw | 20.5 kw | |
4470 ( kcal/h) | 6710 ( kcal/h) | 11610 (kcal/h) | 13760 (kcal/h) | 17630 (kcal/h) | ||
Power supply | 380V/3P/5Hz | |||||
Input power | 3 kw | 4.5 kw | 6.75 kw | 8.6 kw | 10 kw | |
Compressor power | 2.25 kw | 3.75 kw | 6 kw | 7.5 kw | 9 kw | |
Pump power | 0.55 kw | 0.55 kw | 0.75 kw | 0.75 kw | 1.15 kw | |
Pump head | 22.5 m | 21 m | 25.5 m | 25.5 m | 24 m | |
Chilled water flow rate | 1.5 CBM/H | 2.5 CBM/H | 3.5 CBM/H | 4.5 CBM/H | 5.5 CBM/H | |
Cooling water flow rate | 1.8 CBM/H | 3 CBM/H | 4.2 CBM/H | 5.4 CBM/H | 6.6 CBM/H | |
Evaporator type | Water tank/shell and tube stainless steel plate | |||||
Water tank | 55 L | 90 L | 120 L | 200 L | 200 L | |
Pipe size | DN 25 | DN 25 | DN 32 | DN 40 | DN 40 | |
Machine size | 900×520×850 mm | 900×520×850 mm | 1,150×710×1,200 mm | 1,180×720×1,350 mm | 1,180×720×1,350 mm | |
Machine weight | 130 kg | 155 kg | 280 kg | 400 kg | 520 kg |
5, Application of water chiller
6, We can do more for you
7, Our reliable partners
8, Know more about us
Good ideas and correct suggestions will help our potential clients save lot of time and investment cost. As an experienced and completed engineering team, PACKER company will give you a clear idea about the beverage plant. From the processes, we can see the materials flow according to the set line and each individual step works orderly.
From the early consultation to final plant completed, they will work with you. They can design, built, operate your beverage plant according to your ideas.
The experience of Packer company engineering team has been in more than 200 beverage plants. They are familiar with different clients' requirements and know the clients' real matters. With developed machine technology, they have helped clients increase the processing efficiency but decrease the investment cost.
No matter you are a newcomer or a sectoral expert, engineering team can provide professional suggestions. Not only the options about the filling and packing machines, but also the proposal for raw material purchasing, product designing and sale. PACKER company is not only the consultant here, but also takes responsibility for executing the entire project.
What we can do for you:
A, Compiling the basic data
B, Calculating capacity
C, Formulating and assessing solution
D, Designing a plant layout
E, Calculating the energy consumption
F, Providing a time schedule for the project
G, Estimating the budget costs
As a complete-package provider, PACKER company engineering team will give you comprehensive support during the project period and guarantee all planning work will be based on the latest technology.
Â
The bendix is Spare parts for starter. From the Armature to get power, transmitted to the engine.
We supplier good quality for bendix.
POINTS TO ATTENTION:
1- Keep a careful check on gear ring before installation, replace one if damages.
2-Installed surface of both motor and generator should be kept clean, Make sure the strength to the bolts.
3- Clean each connection port, Strictly observed the sketch, Make sure of firm connection and tight electric conduction.
4- Check if the key could be automatic
Starter Drive, Starter Drive Assembly, BOSCH Starter Drive, DELCO Starter Drive, FORD Starter Drive
NINGBO ZHONGWANG AUTO FITTINGS CO.,LTD , http://www.autostarter-alternator.com