Recently, Weihai Zhongyuan Technology successfully signed a contract for the 1+1 hull sea shield ballast water management system equipment of Malaysian shipyard after half a month of negotiation and received a deposit.
It is reported that the equipment will be installed on the new 108m series of oiled products ship of MUHIBBAHMARINE ENGINEERING SDN BHD shipyard and is scheduled to be delivered in March 2018.
It is reported that the equipment will be installed on the new 108m series of oiled products ship of MUHIBBAHMARINE ENGINEERING SDN BHD shipyard and is scheduled to be delivered in March 2018.
Misting Fan,Cool Mist Fan,Portable Misting Fan,Oscillating Misting Fan
Foshan kanasi electrical co.,ltd , https://www.fskanasifan.com