The temporary electricity system should adopt the system of "three-level control and two-pole protection", that is, adopt the total distribution box , distribution box and switch box three levels of control, and distribute the distribution at the same time in the main distribution box and the switch box respectively Leakage protection implement protection Under normal circumstances, electrical equipment can only be wired from the switch box In practice, some construction units because of a certain electrical equipment and distribution box closer to the distribution of power distribution box directly plexus This is not safe.
According to "safety norms" provisions from the wire under the lead wire into the distribution box should be used to wear protection and through the box into the line, the upper end of the protection pipe to do waterproof elbow some construction site but directly under the poles plus cross-dressing, the use of porcelain Wiring leads directly from above. Wire into and out of the box without sheath, no waterproof elbow. This approach is not desirable at the same time in the construction site, we often see the wiring at random distribution box usually not locked or locked but the key is not a special management = into and out of the chaos of the line does not divide into bundles, not Plus protection tube, the length of the missing, chaotic chaos then the power supply, the power cord hooked directly on the knife switch on the box is not standardized wiring, the conductor cut too long, the conductor exposed, "chicken legs line" serious cabinets cabling and Electrical switch layout does not meet the requirements Knife switch porcelain cover lost or nut incomplete A gate multiple machines, or even across the leakage protector Direct knife switch Leakage protection under a relay box with multiple residual wire head, residual melt gadgets And so on, and even stacking shoes and hats, food and other debris has been removed load line is still thrown in the box, naked thread close to the switch electrical In addition, the distribution box layout Lighting and wiring problems Construction site lighting is characterized by more, Wide range, mobility, temporary strong, so that the scene lighting power management is difficult, prone to accidents in humid places and places easily accessible lighting power supply voltage not less than, the use of mobile Lighting occasions, the power supply voltage must not exceed and can not be transformed from the autotransformer transformer, and the other wet places should also be used sealed waterproof dustproof.
However, what we saw is that in the stage of foundation plastering, the ground is extremely damp, and workers do not need to cut off the power and hold the hand-held illumination Laying the line away from the ground, arbitrarily placed on the ground chaos pull pull = aisle at the tube without protection, the bucket on the coming and going, and even some of the site using aluminum core sheath line cord for power lines and lighting and some wires Lighting tied to the wire, the iron frame, the right tree In addition, the aging of the lighting line is serious, the insulation is broken = the middle of the lighting line connector, the connector is not protected Lighting lines No switch box, no knife switch , And the lighting lines directly linked to the other equipment on the knife, or lighting circuit to bypass the leakage protector connected to the knife switch on the site of temporary lighting facilities layout is too low, free to break joints, like spider-like cable , And even some people hang clothes on it and so on. These violations are not uncommon, a lot of hidden dangers, urgent need to cause the construction unit heads attach great importance.
Industrial crane is a heavy-duty machine used to lift and move heavy loads in industrial settings such as construction sites, factories, steel mills, and ports, etc. It consists of a large, sturdy steel frame that supports a boom or arm that can be extended and retracted to reach different heights and distances. The boom is typically equipped with a hoist or winch that can lift and lower loads, and the crane may also be equipped with various attachments such as hooks, buckets, or magnets to handle different types of materials. Industrial cranes can be powered by electricity, diesel fuel, or hydraulic systems, and they come in a wide range of sizes and configurations to suit different applications and environments.
Industrial crane have many different types as per application location, such as Overhead Crane, Gantry Crane , suspension crane, Jib Crane , Semi Gantry Crane, etc. These types cranes with different lifting tools, such as hooks, Container Spreader, electric magnet plate, kinds of grab, etc, work together with different types of cranes to lift different goods and move planed location.
Also, There are several methods for controlling a crane, including:
1. Manual control: This involves a crane operator using hand levers, foot pedals, or joysticks to control the crane's movements. The operator must have a clear view of the crane and the load being lifted.
2. Radio control: This method involves using a remote control to operate the crane from a distance. The operator can stand at a safe distance and control the crane's movements using a handheld device.
3. Computer intelligent control: This method involves using a computer to control the crane's movements. The operator inputs the desired movements into a computer program, which then controls the crane's movements automatically.
4. Automated control: This method involves using sensors and cameras to automate the crane's movements. The crane can be programmed to move and lift loads without the need for a human operator
As per theirs structure, there are overhead crane, bridge crane, gantry crane, semi gantry crane, port cranes, etc.
Industrial Crane,Bulk Coal Loading Crane,Mass Goods Loading Crane,Chain Bucket Materials Crane
HENAN MAJOR INDUSTRIES IMP. & EXP. CO., LTD. , https://www.henanminingcrane.com