Construction and working principle of zinc wire replacement box

Metal zinc wire is replaced with the replacement tank for precipitation from a solution containing gold in cyanide. The replacement sedimentation tank is an open rectangular box made of wood, steel or cement (see the figure below ). The geometrical size is determined according to the amount of the treatment liquid and the convenience of the operation. The general length of the box is 3. 5 ~ 7 .3 meters , width 0.5 ~ 1 .0 meters , high at 0.75 ~ 0 .9 meters between. The box is divided into 7 to 9 slots by upper and lower partitions. The first groove serves as a clarification grid without the addition of zinc wire. The gold-containing liquid is first placed in the first tank, and is displaced through the screen and the zinc wire layer from the bottom of the second tank through the flow gap, and then proceeds to the next tank. The lean liquid flows out from the last tank discharge port, and the gold mud partially adheres to the zinc wire, and most of it sinks to the bottom of the tank, and finally is uniformly recovered.

Becides Terex Hoist Valve,Terex Control Valve and Terex Brake Valve,we have Terex multiport/accumulator valve15013717;Terex relay valve09018245;Terex dry/wet valve assy02402041; Terex Valve kick over15014890;Terex synchronous valve09006527;Terex unloader valve09019313/09229477;Terex four-circuit protection valve15041313;Terex quick release valve02396430;Terex check valve02356564;Terex safety valve02255197;Terex valve stem etc.

Terex Other Valve

Terex Relay Valve,Terex Multiport Valve,Terex Accumulator Valve,Terex Check Valve

Chengdu Svoda Machinery Equipment Co.,Ltd , https://www.svdequip.com

Posted on