First of all, according to the procurement of spare parts and accessories, the procurement of parts, quantities, and total price will be sent to the computer, followed by statistics, analysis, and summary of the number of spare parts and the availability of the month. Finally produce the purchase plan for the accessory. This cycle starts and ends. Handling the use of monthly offenses Automobile folding included a piece of agricultural product calculations summary side-by-side training Ni inventory inventory processing accessories lending out waste management Lianhe split bar mechanical fittings and accessories use management According to the accessories used information, calculate each The use of accessories for departments, departments, and special projects is calculated and used to calculate the cost of parts used in production and maintenance of each department. Accessory inventory management can query all parts of the warehouse randomly. The classification of accessories shall be implemented so as to focus on the management of the variety funds. The entire system was developed from the application of trial buckets to the application of feedback trimming points. It has undergone many iterations and has gradually matured. For example, we use the unit price of the bill of materials as an example. We have made a principle change procedure. When the unit price is initially designed, the normal management method of the user is used directly. The unit price of the used spare part is the unit price of the spare part. The unit price in the calculation of the summary.
After the entire system has been operating for nearly six months, it has been found that the inventory quantity of certain accessories on the inventory report sheet is zero, but the total amount of the accessories is not equal to zero abnormality. That is, the number of unit price and half price, after analyzing and verifying this, we found that in the original management, the unit price treatment of the bill of materials was considered to be insufficient, and simply setting the billing unit price as the unit price of the inventory was in error. Because the market price fluctuates frequently, the unit price of parts we purchase is also changed randomly. That is to buy the same kind of tile, the price will be high or low, it is impossible to unify. In this regard, we have to deal with the allocation of accessories in the design of the program will be a special treatment of the new material is present in the warehouse there is no such material, is added this month, the price of the second feed price.
1. The size of L edge board: 25mm~120mm
2. The size of U type board: inner width:15~150mm; Max.height:100mm
3. The punch size of L edge board: within 60mm(choose one size)
4. The maximum quantity of layer:13 layers
5. Speed:
(1) L edge board:0~30m/min
(2) Punch edge board: 0~30m/min
(3) U type board:0~20m/min
6. Power Supply : 18kw
7. The dimension of machine: 33000*1400*1925mm
8. Total weight: 6800kg
Paper Edge Protector,Paper Edge Machine,Edge Protector Machine,Paper Edge Protector Machine