1, asphalt insulation pump working life, this is not included in the factory test project, a type test project. In order to ensure the quality of regular manufacturers should be selected brand-name products.
2, bitumen heat pump working standard: sub-long-term work system, repeated short-term work system and short-term work system three. Conventional products are long-term work system, that coil allows long-term power work. For a long time the valve is opened only for a short time off, it is appropriate to use the normally open asphalt insulation pump. Used in short-time working system and the volume is very large, special orders can be made to reduce power consumption.
3, Asphalt heat preservation pump working frequency: When the action frequency is high, the structure should be preferred direct acting asphaltic heat preservation pump, the power is preferably exchange.
4, the reliability of asphalt pump action, strictly speaking, this test has not been formally included in China's professional standard asphalt heat pump, to ensure that the quality should be selected regular manufacturers brand-name products. In some occasions, the number of actions is not much, but the reliability requirements are very high, such as fire protection, emergency protection, must not be taken lightly. Particularly important, you should also take two double insurance.
More Search Keywords : Asphalt pump
· Drilling-Loading-Bolting Integrated Unit is with multi-usage,integrating multiple functions including drill jumbo, rock bolting machine, mucking loader, crusher and into one unit, which avoids the problem of multiple devices crossing each other in the roadway and the problem of tunneling in hard rock roadway can be solved comprehensively.
· Drilling, bolting, loading, digging, crushing and other functional modules are with reasonable layout for non-interference during the working. It not only reduces the repeated input of power equipment, but also reduce the purchase and maintenance cost of the whole machine.
· The drilling arm adopts double-triangle self-parallel mechanism and 360 ° flexible displacement mechanism, which can realize multi-position and multi-angle drilling.
· Folding type scraper plate, double chain scraper structure and large scope of dipper realize the efficient and reliable loading capacity.
Drill Loader Bolter Integrated Equipment
Tunneling Machinery,Portable Drilling Rig,Drill Loader Bolter Equipment,Loader Integrated Machine
NORTH HEAVY GRYPS EQUIPMENT AND ENGINEERING CO.,LTD , https://www.nhgtunnel.com